Skip to content
EPCMap

How energy efficient are homes in DN8 (Doncaster)?

Summary

Average rating

D66

Doncaster average: D 66

Homes in DN8 have an average EPC rating of D (66), about the same as the Doncaster average of D (66).

Rated D or worse
54%
Doncaster: 55%
Typical yearly energy cost
£1,056
EPCs since 2021, at prices then
Built before 1930
16%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Doncaster average.

  • Band A, score 92 to 100: <1% of homes; Doncaster <1%.
  • Band B, score 81 to 91: 12% of homes; Doncaster 13%.
  • Band C, score 69 to 80: 33% of homes; Doncaster 32%.
  • Band D, score 55 to 68: 41% of homes; Doncaster 42%.
  • Band E, score 39 to 54: 11% of homes; Doncaster 11%.
  • Band F, score 21 to 38: 2% of homes; Doncaster 2%.
  • Band G, score 1 to 20: <1% of homes; Doncaster <1%.

Based on the latest energy performance certificate (EPC) for each of 5,732 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in DN8.

Main heating

Gas boiler92%
Oil boiler4%
Other electric heating2%
Communal or district heating1%
Electric storage heaters1%

Type of home

House75%
Bungalow14%
Flat10%

Walls, roof and windows

Solid walls, not insulated13%
Cavity walls, not insulated12%
Cavity walls, insulated54%
Solid walls, insulated3%
Other walls (timber, system-built or modern)19%
Loft insulation under 100 mm (homes with a loft)19%
Double or triple glazing throughout95%
Solar panels3%

Upgrades recommended for homes in DN8

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 84% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 76% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 63% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 23% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 22% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450
  • Solid wall insulation (internal or external)

    On 15% of EPCs here (England and Wales: 24%). 13% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000

With all its recommended upgrades, 96% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £122 a year, at the prices used when each EPC was issued.

Map of DN8 and nearby areas

How DN8 compares with the postcode districts around it.

YO8, Selby: D 67LS25, Leeds: C 69DN14, Goole: D 66HU15, Brough: C 69DN15, Scunthorpe: D 65WF11, Knottingley: C 69DN17, Scunthorpe: D 66WF8, Pontefract: C 69DN6, Doncaster: D 66DN16, Scunthorpe: D 68DN2, Doncaster: D 65DN7, Doncaster: D 67DN1, Doncaster: D 64DN21, Gainsborough: D 67DN3, Doncaster: C 69DN5, Doncaster: D 64DN9, Doncaster: D 67DN4, Doncaster: D 68DN12, Doncaster: D 66DN10, Doncaster: D 64DN11, Doncaster: C 69DN14DN17DN6DN2DN7DN3DN9DN4DN8DN14DN17DN6DN2DN7DN1DN3DN9DN4DN8
Colour shows each district's average rating. Tap a district to open it. DN8 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in DN8?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.