Skip to content
EPCMap

How energy efficient are homes in DN12 (Doncaster)?

Summary

Average rating

D66

Doncaster average: D 66

Homes in DN12 have an average EPC rating of D (66), about the same as the Doncaster average of D (66).

Rated D or worse
57%
Doncaster: 55%
Typical yearly energy cost
£1,088
EPCs since 2021, at prices then
Built before 1930
17%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Doncaster average.

  • Band A, score 92 to 100: <1% of homes; Doncaster <1%.
  • Band B, score 81 to 91: 12% of homes; Doncaster 13%.
  • Band C, score 69 to 80: 32% of homes; Doncaster 32%.
  • Band D, score 55 to 68: 44% of homes; Doncaster 42%.
  • Band E, score 39 to 54: 11% of homes; Doncaster 11%.
  • Band F, score 21 to 38: 2% of homes; Doncaster 2%.
  • Band G, score 1 to 20: <1% of homes; Doncaster <1%.

Based on the latest energy performance certificate (EPC) for each of 8,248 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in DN12.

Main heating

Gas boiler94%
Oil boiler2%
Other electric heating2%
Heat pump1%
Communal or district heating1%

Type of home

House74%
Bungalow16%
Flat10%

Walls, roof and windows

Solid walls, not insulated16%
Cavity walls, not insulated11%
Cavity walls, insulated54%
Solid walls, insulated2%
Other walls (timber, system-built or modern)17%
Loft insulation under 100 mm (homes with a loft)21%
Double or triple glazing throughout96%
Solar panels2%

Upgrades recommended for homes in DN12

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 86% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 78% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 58% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Heating controls

    On 21% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450
  • New condensing boiler

    On 18% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Solid wall insulation (internal or external)

    On 18% of EPCs here (England and Wales: 24%). 16% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000

With all its recommended upgrades, 95% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £130 a year, at the prices used when each EPC was issued.

Map of DN12 and nearby areas

How DN12 compares with the postcode districts around it.

S71, Barnsley: D 68DN2, Doncaster: D 65DN7, Doncaster: D 67S72, Barnsley: D 67DN1, Doncaster: D 64S97: not enough EPCs to showS73, Barnsley: D 68DN3, Doncaster: C 69DN5, Doncaster: D 64DN4, Doncaster: D 68S63, Rotherham: C 69S64, Mexborough: D 66S62, Rotherham: D 67S60, Rotherham: C 70S9, Sheffield: D 64S61, Rotherham: D 67S65, Rotherham: D 67DN11, Doncaster: C 69S66, Rotherham: D 67S25, Sheffield: D 67S81, Worksop: D 68DN2DN1DN4S63S64S62S60S65DN11S66DN12DN2DN1DN4S63S64S62S60S65DN11S66DN12
Colour shows each district's average rating. Tap a district to open it. DN12 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in DN12?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.