Skip to content
EPCMap

How energy efficient are homes in DL12 (Barnard Castle, County Durham)?

Summary

Average rating

D61

County Durham average: D 67

Homes in DL12 have an average EPC rating of D (61), well below the County Durham average of D (67). 36% of homes here have solid walls with no insulation.

Rated D or worse
63%
County Durham: 48%
Typical yearly energy cost
£1,376
EPCs since 2021, at prices then
Built before 1930
39%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the County Durham average.

  • Band A, score 92 to 100: <1% of homes; County Durham 1%.
  • Band B, score 81 to 91: 13% of homes; County Durham 11%.
  • Band C, score 69 to 80: 24% of homes; County Durham 40%.
  • Band D, score 55 to 68: 33% of homes; County Durham 37%.
  • Band E, score 39 to 54: 20% of homes; County Durham 9%.
  • Band F, score 21 to 38: 8% of homes; County Durham 2%.
  • Band G, score 1 to 20: 3% of homes; County Durham <1%.

Based on the latest energy performance certificate (EPC) for each of 4,671 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in DL12.

Main heating

Gas boiler60%
Oil boiler26%
Electric storage heaters6%
Heat pump3%
Other electric heating3%
Communal or district heating2%

Type of home

House76%
Bungalow12%
Flat11%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated37%
Cavity walls, not insulated9%
Cavity walls, insulated30%
Solid walls, insulated7%
Other walls (timber, system-built or modern)17%
Loft insulation under 100 mm (homes with a loft)16%
Double or triple glazing throughout83%
Solar panels1%

Upgrades recommended for homes in DL12

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solid wall insulation (internal or external) More common here

    On 39% of EPCs here (England and Wales: 24%). 36% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Double glazing More common here

    On 14% of EPCs here (England and Wales: 9%). 17% of homes aren't fully double or triple glazed.

    Typical cost: £3,300–£6,500
  • Solar panels (PV)

    On 84% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 68% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 58% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 22% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 91% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £194 a year, at the prices used when each EPC was issued.

Map of DL12 and nearby areas

How DL12 compares with the postcode districts around it.

CA6, Carlisle: D 58NE21, Blaydon-On-Tyne: D 68NE11, Gateshead: D 67NE16, Newcastle Upon Tyne: D 66NE8, Gateshead: C 69NE36, East Boldon: D 65NE32, Jarrow: D 66NE92: not enough EPCs to showNE35, Boldon Colliery: D 68NE45, Corbridge: D 67NE40, Ryton: D 68NE42, Prudhoe: D 68NE10, Gateshead: D 67SR1, Sunderland: C 69SR5, Sunderland: C 69SR6, Sunderland: D 64NE9, Gateshead: D 66SR4, Sunderland: D 66NE43, Stocksfield: D 60NE85: not enough EPCs to showNE46, Hexham: D 65NE37, Washington: C 70NE38, Washington: C 70NE44, Riding Mill: D 58CA3, Carlisle: D 68CA1, Carlisle: D 67NE17, Newcastle Upon Tyne: D 66NE49, Haltwhistle: D 60NE39, Rowlands Gill: D 66DL16, Spennymoor: C 71DH7, Durham: D 68DH3, Chester Le Street: D 68SR2, Sunderland: D 67SR3, Sunderland: C 70DH9, Stanley: D 67CA8, Brampton: D 59DH2, Chester Le Street: C 69DH4, Houghton Le Spring: C 70DH5, Houghton Le Spring: C 69SR7, Seaham: D 68NE47, Hexham: E 52DH8, Consett: D 67DH6, Durham: C 69SR8, Peterlee: D 68CA4, Carlisle: D 62DH1, Durham: C 69TS29, Trimdon Station: D 66CA9, Alston: D 55DL15, Crook: D 67TS28, Wingate: C 70TS27, Hartlepool: D 68DL17, Ferryhill: D 67DL4, Shildon: D 67TS22, Billingham: C 75DL13, Bishop Auckland: D 56DL14, Bishop Auckland: D 68DL5, Newton Aycliffe: C 70TS20, Stockton-On-Tees: D 66TS19, Stockton-On-Tees: D 67TS21, Stockton-On-Tees: C 70TS18, Stockton-On-Tees: D 68TS17, Stockton-On-Tees: C 70DL1, Darlington: D 67DL3, Darlington: D 64CA11, Penrith: D 65TS16, Stockton-On-Tees: C 70CA16, Appleby-In-Westmorland: D 60DL2, Darlington: C 70TS15, Yarm: C 70CA10, Penrith: D 56CA17, Kirkby Stephen: D 57DL7, Northallerton: D 66DL9, Catterick Garrison: C 70DL10, Richmond: D 64DL11, Richmond: E 50LA22, Ambleside: D 58LA23, Windermere: D 61LA9, Kendal: D 67DL6, Northallerton: D 67LA7, Milnthorpe: D 60LA8, Kendal: D 58LA10, Sedbergh: D 57LA11, Grange-Over-Sands: D 60DL8, Bedale: D 60YO7, Thirsk: D 67LA6, Carnforth: D 62HG4, Ripon: D 64BD23, Skipton: D 63SR5DH7DH9SR7NE47DH8DH6CA4DH1CA9DL15DL17DL13DL14TS21CA16DL2CA10CA17DL7DL9DL10DL11LA8LA10DL12NE16SR5NE38DL16DH7DH3SR3DH9DH5NE47DH8DH6CA4DH1CA9DL17DL4DL13TS21DL1TS16CA16DL2CA10CA17DL7DL9DL10DL11LA9LA8LA10DL8DL12
Colour shows each district's average rating. Tap a district to open it. DL12 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in DL12?

About 37% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. 39% were built before 1930. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.