Skip to content
EPCMap

How energy efficient are homes in NE32 (Jarrow, South Tyneside)?

Summary

Average rating

D66

South Tyneside average: D 68

Homes in NE32 have an average EPC rating of D (66), a little below the South Tyneside average of D (68).

Rated D or worse
56%
South Tyneside: 49%
Typical yearly energy cost
£1,074
EPCs since 2021, at prices then
Built before 1930
13%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the South Tyneside average.

  • Band A, score 92 to 100: <1% of homes; South Tyneside <1%.
  • Band B, score 81 to 91: 5% of homes; South Tyneside 9%.
  • Band C, score 69 to 80: 38% of homes; South Tyneside 42%.
  • Band D, score 55 to 68: 47% of homes; South Tyneside 41%.
  • Band E, score 39 to 54: 8% of homes; South Tyneside 7%.
  • Band F, score 21 to 38: <1% of homes; South Tyneside <1%.
  • Band G, score 1 to 20: <1% of homes; South Tyneside <1%.

Based on the latest energy performance certificate (EPC) for each of 8,705 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in NE32.

Main heating

Gas boiler94%
Communal or district heating3%
Electric storage heaters1%

Type of home

House69%
Flat21%
Bungalow10%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated11%
Cavity walls, not insulated22%
Cavity walls, insulated58%
Other walls (timber, system-built or modern)8%
Loft insulation under 100 mm (homes with a loft)14%
Double or triple glazing throughout95%
Solar panels2%

Upgrades recommended for homes in NE32

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Cavity wall insulation More common here

    On 25% of EPCs here (England and Wales: 16%). 22% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Solar panels (PV)

    On 76% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Floor insulation

    On 68% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solar water heating

    On 66% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Heating controls

    On 20% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450
  • New condensing boiler

    On 17% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 96% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £142 a year, at the prices used when each EPC was issued.

Map of NE32 and nearby areas

How NE32 compares with the postcode districts around it.

NE30, North Shields: D 66NE28, Wallsend: C 70NE29, North Shields: C 69NE12, Newcastle Upon Tyne: C 70NE34, South Shields: D 68NE7, Newcastle Upon Tyne: D 66NE33, South Shields: D 67NE6, Newcastle Upon Tyne: D 68NE8, Gateshead: C 69NE36, East Boldon: D 65NE31, Hebburn: C 71NE35, Boldon Colliery: D 68NE10, Gateshead: D 67SR5, Sunderland: C 69SR6, Sunderland: D 64NE9, Gateshead: D 66NE37, Washington: C 70NE28NE34NE33NE6NE36NE31NE35NE10SR6NE32NE28NE34NE33NE6NE36NE31NE35NE10SR6NE32
Colour shows each district's average rating. Tap a district to open it. NE32 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in NE32?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.