Skip to content
EPCMap

How energy efficient are homes in WA2 (Warrington)?

Summary

Average rating

C69

Warrington average: D 68

Homes in WA2 have an average EPC rating of C (69), about the same as the Warrington average of D (68).

Rated D or worse
44%
Warrington: 47%
Typical yearly energy cost
£923
EPCs since 2021, at prices then
Built before 1930
11%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Warrington average.

  • Band A, score 92 to 100: <1% of homes; Warrington <1%.
  • Band B, score 81 to 91: 10% of homes; Warrington 13%.
  • Band C, score 69 to 80: 46% of homes; Warrington 40%.
  • Band D, score 55 to 68: 37% of homes; Warrington 37%.
  • Band E, score 39 to 54: 6% of homes; Warrington 8%.
  • Band F, score 21 to 38: <1% of homes; Warrington 1%.
  • Band G, score 1 to 20: <1% of homes; Warrington <1%.

Based on the latest energy performance certificate (EPC) for each of 14,552 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in WA2.

Main heating

Gas boiler88%
Other electric heating6%
Communal or district heating3%
Electric storage heaters2%
Oil boiler1%

Type of home

House67%
Flat23%
Bungalow10%

Walls, roof and windows

Solid walls, not insulated10%
Cavity walls, not insulated21%
Cavity walls, insulated52%
Other walls (timber, system-built or modern)16%
Loft insulation under 100 mm (homes with a loft)18%
Double or triple glazing throughout94%
Solar panels6%

Upgrades recommended for homes in WA2

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 70% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 66% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 61% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Cavity wall insulation

    On 23% of EPCs here (England and Wales: 16%). 21% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • New condensing boiler

    On 19% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 18% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 97% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £121 a year, at the prices used when each EPC was issued.

Map of WA2 and nearby areas

How WA2 compares with the postcode districts around it.

WN2, Wigan: D 67WN5, Wigan: D 66M28, Manchester: C 70WN4, Wigan: D 65WN7, Leigh: D 68M29, Manchester: D 67M30, Manchester: D 68WA11, St. Helens: D 65WA12, Newton-Le-Willows: C 69WA10, St. Helens: D 66M44, Manchester: D 67M31, Manchester: C 71WA9, St. Helens: C 70WA3, Warrington: D 68WA4, Warrington: D 67WA1, Warrington: C 69L35, Prescot: D 68WA5, Warrington: C 70WA16, Knutsford: D 64WA7, Runcorn: C 69WA8, Widnes: D 68WA13, Lymm: D 67WA14, Altrincham: D 67WA12M44WA9WA3WA1WA5WA13WA2M29WA12M44WA9WA3WA1WA5WA13WA2
Colour shows each district's average rating. Tap a district to open it. WA2 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in WA2?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.