Skip to content
EPCMap

How energy efficient are homes in WF10 (Castleford, Wakefield)?

Summary

Average rating

C69

Wakefield average: D 68

Homes in WF10 have an average EPC rating of C (69), about the same as the Wakefield average of D (68).

Rated D or worse
45%
Wakefield: 50%
Typical yearly energy cost
£861
EPCs since 2021, at prices then
Built before 1930
20%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Wakefield average.

  • Band A, score 92 to 100: 1% of homes; Wakefield 1%.
  • Band B, score 81 to 91: 18% of homes; Wakefield 14%.
  • Band C, score 69 to 80: 36% of homes; Wakefield 35%.
  • Band D, score 55 to 68: 36% of homes; Wakefield 40%.
  • Band E, score 39 to 54: 8% of homes; Wakefield 9%.
  • Band F, score 21 to 38: 1% of homes; Wakefield 1%.
  • Band G, score 1 to 20: <1% of homes; Wakefield <1%.

Based on the latest energy performance certificate (EPC) for each of 18,366 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in WF10.

Main heating

Gas boiler93%
Other electric heating2%
Communal or district heating2%
Electric storage heaters1%

Type of home

House81%
Flat11%
Bungalow7%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated20%
Cavity walls, not insulated7%
Cavity walls, insulated47%
Solid walls, insulated3%
Other walls (timber, system-built or modern)23%
Loft insulation under 100 mm (homes with a loft)20%
Double or triple glazing throughout97%
Solar panels1%

Upgrades recommended for homes in WF10

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 82% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 75% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 52% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 21% of EPCs here (England and Wales: 24%). 20% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 14% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 13% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 97% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £101 a year, at the prices used when each EPC was issued.

Map of WF10 and nearby areas

How WF10 compares with the postcode districts around it.

LS8, Leeds: D 62LS24, Tadcaster: D 65LS7, Leeds: D 68LS14, Leeds: C 70LS26, Leeds: D 67LS9, Leeds: D 68LS15, Leeds: D 66LS88: not enough EPCs to showYO8, Selby: D 67LS10, Leeds: C 70LS25, Leeds: C 69DN14, Goole: D 66WF3, Wakefield: C 69WF6, Normanton: D 67WF11, Knottingley: C 69WF1, Wakefield: C 69WF2, Wakefield: D 67WF7, Pontefract: D 68WF8, Pontefract: C 69WF4, Wakefield: D 66DN6, Doncaster: D 66LS26LS9LS25WF3WF6WF11WF1WF7WF8WF10LS26LS9LS25WF3WF6WF11WF1WF7WF8WF10
Colour shows each district's average rating. Tap a district to open it. WF10 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in WF10?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.