Skip to content
EPCMap

How energy efficient are homes in RM19 (Purfleet, Thurrock)?

Summary

Average rating

C70

Thurrock average: D 68

Homes in RM19 have an average EPC rating of C (70), a little above the Thurrock average of D (68). 60% of homes here are flats or maisonettes.

Rated D or worse
36%
Thurrock: 49%
Typical yearly energy cost
£798
EPCs since 2021, at prices then
Built before 1930
4%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Thurrock average.

  • Band A, score 92 to 100: <1% of homes; Thurrock <1%.
  • Band B, score 81 to 91: 12% of homes; Thurrock 12%.
  • Band C, score 69 to 80: 52% of homes; Thurrock 38%.
  • Band D, score 55 to 68: 29% of homes; Thurrock 39%.
  • Band E, score 39 to 54: 7% of homes; Thurrock 9%.
  • Band F, score 21 to 38: <1% of homes; Thurrock 1%.
  • Band G, score 1 to 20: <1% of homes; Thurrock <1%.

Based on the latest energy performance certificate (EPC) for each of 2,588 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in RM19.

Main heating

Gas boiler45%
Electric storage heaters32%
Other electric heating20%
Heat pump2%

Type of home

Flat54%
House37%
Maisonette6%
Bungalow3%

Walls, roof and windows

Solid walls, not insulated6%
Cavity walls, not insulated12%
Cavity walls, insulated57%
Other walls (timber, system-built or modern)25%
Loft insulation under 100 mm (homes with a loft)14%
Double or triple glazing throughout93%

Upgrades recommended for homes in RM19

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Modern storage heaters More common here

    On 39% of EPCs here (England and Wales: 6%). 52% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • Solar panels (PV)

    On 39% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 33% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 33% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Loft insulation top-up

    On 13% of EPCs here (England and Wales: 12%). 14% of homes with a loft have less than 100 mm of insulation.

    Typical cost: £100–£350
  • Hot water cylinder insulation

    On 12% of EPCs here (England and Wales: 8%).

    Typical cost: £15–£30

With all its recommended upgrades, 97% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £146 a year, at the prices used when each EPC was issued.

Map of RM19 and nearby areas

How RM19 compares with the postcode districts around it.

RM9, Dagenham: C 69RM10, Dagenham: D 66RM14, Upminster: D 62RM15, South Ockendon: D 68RM16, Grays: D 68DA8, Erith: C 70RM13, Rainham: C 69DA17, Belvedere: D 66RM17, Grays: D 66RM20, Grays: C 73DA6, Bexleyheath: D 67DA7, Bexleyheath: D 62RM18, Tilbury: D 67DA5, Bexley: D 63DA9, Greenhithe: C 74DA10, Swanscombe: C 78DA1, Dartford: C 69DA11, Gravesend: C 69DA2, Dartford: D 68RM15DA8RM13RM17RM20DA9DA10DA1RM19RM15DA8RM13RM17RM20DA9DA10DA1RM19
Colour shows each district's average rating. Tap a district to open it. RM19 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in RM19?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.