Skip to content
EPCMap

How energy efficient are homes in SK4 (Stockport)?

Summary

Average rating

D64

Stockport average: D 65

Homes in SK4 have an average EPC rating of D (64), about the same as the Stockport average of D (65).

Rated D or worse
62%
Stockport: 59%
Typical yearly energy cost
£1,056
EPCs since 2021, at prices then
Built before 1930
28%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Stockport average.

  • Band A, score 92 to 100: <1% of homes; Stockport <1%.
  • Band B, score 81 to 91: 6% of homes; Stockport 9%.
  • Band C, score 69 to 80: 32% of homes; Stockport 33%.
  • Band D, score 55 to 68: 44% of homes; Stockport 44%.
  • Band E, score 39 to 54: 16% of homes; Stockport 13%.
  • Band F, score 21 to 38: 2% of homes; Stockport 2%.
  • Band G, score 1 to 20: <1% of homes; Stockport <1%.

Based on the latest energy performance certificate (EPC) for each of 11,471 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in SK4.

Main heating

Gas boiler80%
Other electric heating9%
Electric storage heaters6%
Communal or district heating3%

Type of home

House67%
Flat30%
Bungalow2%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated17%
Cavity walls, not insulated28%
Cavity walls, insulated44%
Other walls (timber, system-built or modern)10%
Loft insulation under 100 mm (homes with a loft)33%
Double or triple glazing throughout84%
Solar panels1%

Upgrades recommended for homes in SK4

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Cavity wall insulation More common here

    On 31% of EPCs here (England and Wales: 16%). 28% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Solar panels (PV)

    On 67% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Floor insulation

    On 57% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solar water heating

    On 50% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Heating controls

    On 22% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450
  • New condensing boiler

    On 22% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 91% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £162 a year, at the prices used when each EPC was issued.

Map of SK4 and nearby areas

How SK4 compares with the postcode districts around it.

M15, Manchester: C 77M12, Manchester: C 70M18, Manchester: D 68M13, Manchester: C 69M16, Manchester: D 68M20, Manchester: D 67M34, Manchester: D 66M14, Manchester: D 67SK14, Hyde: D 68M21, Manchester: D 65SK5, Stockport: D 67M19, Manchester: D 65M33, Sale: D 64SK2, Stockport: D 65SK1, Stockport: D 68SK3, Stockport: D 66M23, Manchester: C 69M22, Manchester: C 69SK6, Stockport: D 64SK8, Cheadle: D 65WA15, Altrincham: D 64SK7, Stockport: D 66M18M13M16M20M34M14SK5M19SK2SK1SK3M22SK4M18M13M16M20M34M14M21SK5M19SK2SK1SK3M22SK4
Colour shows each district's average rating. Tap a district to open it. SK4 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in SK4?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.