Skip to content
EPCMap

How energy efficient are homes in SY17 (Caersws, Powys)?

Summary

Average rating

D57

Powys average: D 60

Homes in SY17 have an average EPC rating of D (57), a little below the Powys average of D (60).

Rated D or worse
68%
Powys: 64%
Typical yearly energy cost
£1,502
EPCs since 2021, at prices then
Built before 1930
36%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Powys average.

  • Band A, score 92 to 100: 2% of homes; Powys 2%.
  • Band B, score 81 to 91: 8% of homes; Powys 7%.
  • Band C, score 69 to 80: 22% of homes; Powys 26%.
  • Band D, score 55 to 68: 30% of homes; Powys 33%.
  • Band E, score 39 to 54: 20% of homes; Powys 19%.
  • Band F, score 21 to 38: 11% of homes; Powys 8%.
  • Band G, score 1 to 20: 8% of homes; Powys 4%.

Based on the latest energy performance certificate (EPC) for each of 1,234 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in SY17.

Main heating

Oil boiler54%
Gas boiler30%
Heat pump6%
Electric storage heaters5%
Other electric heating2%
Solid fuel or wood2%

Type of home

House73%
Bungalow23%
Flat4%

Walls, roof and windows

Solid walls, not insulated29%
Cavity walls, not insulated13%
Cavity walls, insulated34%
Solid walls, insulated5%
Other walls (timber, system-built or modern)19%
Loft insulation under 100 mm (homes with a loft)17%
Double or triple glazing throughout83%
Solar panels2%

Upgrades recommended for homes in SY17

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Hot water cylinder insulation More common here

    On 19% of EPCs here (England and Wales: 8%).

    Typical cost: £15–£30
  • New condensing boiler More common here

    On 34% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Roof insulation (flat roof or room in roof) More common here

    On 12% of EPCs here (England and Wales: 7%).

    Typical cost: £900–£1,500
  • Solar panels (PV)

    On 82% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 81% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 61% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000

With all its recommended upgrades, 88% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £226 a year, at the prices used when each EPC was issued.

Map of SY17 and nearby areas

How SY17 compares with the postcode districts around it.

SY10, Oswestry: D 58LL40, Dolgellau: E 54SY22, Llanymynech: D 58LL36, Tywyn: D 57SY21, Welshpool: D 60SY5, Shrewsbury: D 63SY9, Bishops Castle: E 54SY20, Machynlleth: E 51SY19, Llanbrynmair: E 51SY15, Montgomery: D 57SY24, Borth: D 56SY16, Newtown: D 65SY18, Llanidloes: D 60SY7, Craven Arms: E 54LD7, Knighton: D 58SY23, Aberystwyth: D 62LD6, Rhayader: D 60LD8, Presteigne: D 58LD1, Llandrindod Wells: D 62SY25, Tregaron: E 51SY21SY20SY19SY15SY16SY18LD7SY23SY17SY21SY20SY19SY15SY16SY18LD7SY23SY17
Colour shows each district's average rating. Tap a district to open it. SY17 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in SY17?

36% were built before 1930. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.