Skip to content
EPCMap

How energy efficient are homes in DN41 (Grimsby, North East Lincolnshire)?

Summary

Average rating

D68

North East Lincolnshire average: D 66

Homes in DN41 have an average EPC rating of D (68), a little above the North East Lincolnshire average of D (66).

Rated D or worse
49%
North East Lincolnshire: 56%
Typical yearly energy cost
£1,045
EPCs since 2021, at prices then
Built before 1930
11%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the North East Lincolnshire average.

  • Band A, score 92 to 100: 2% of homes; North East Lincolnshire <1%.
  • Band B, score 81 to 91: 16% of homes; North East Lincolnshire 9%.
  • Band C, score 69 to 80: 32% of homes; North East Lincolnshire 34%.
  • Band D, score 55 to 68: 38% of homes; North East Lincolnshire 43%.
  • Band E, score 39 to 54: 9% of homes; North East Lincolnshire 11%.
  • Band F, score 21 to 38: 2% of homes; North East Lincolnshire 2%.
  • Band G, score 1 to 20: <1% of homes; North East Lincolnshire <1%.

Based on the latest energy performance certificate (EPC) for each of 2,114 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in DN41.

Main heating

Gas boiler93%
Oil boiler4%
Heat pump1%

Type of home

House73%
Bungalow23%
Flat4%

Walls, roof and windows

Solid walls, not insulated11%
Cavity walls, not insulated14%
Cavity walls, insulated55%
Other walls (timber, system-built or modern)19%
Loft insulation under 100 mm (homes with a loft)11%
Double or triple glazing throughout95%
Solar panels3%

Upgrades recommended for homes in DN41

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 88% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 77% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 57% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 24% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 21% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450
  • Cavity wall insulation

    On 16% of EPCs here (England and Wales: 16%). 14% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 95% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £118 a year, at the prices used when each EPC was issued.

Map of DN41 and nearby areas

How DN41 compares with the postcode districts around it.

HU12, Hull: D 64DN40, Immingham: D 68DN19, Barrow-Upon-Humber: D 65DN18, Barton-Upon-Humber: D 67HU19, Withernsea: D 63DN31, Grimsby: D 65DN39, Ulceby: D 65DN33, Grimsby: C 69DN34, Grimsby: D 65DN32, Grimsby: D 64DN35, Cleethorpes: D 63DN36, Grimsby: D 67DN38, Barnetby: D 64DN20, Brigg: D 66LN11, Louth: D 65DN37, Grimsby: D 67LN7, Market Rasen: D 63DN40DN31DN39DN33DN34DN35DN38DN37DN41DN40DN19DN31DN39DN33DN34DN32DN35DN38DN37DN41
Colour shows each district's average rating. Tap a district to open it. DN41 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in DN41?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.