Skip to content
EPCMap

How energy efficient are homes in WR15 (Tenbury Wells, Malvern Hills)?

Summary

Average rating

D60

Malvern Hills average: D 65

Homes in WR15 have an average EPC rating of D (60), well below the Malvern Hills average of D (65).

Rated D or worse
67%
Malvern Hills: 54%
Typical yearly energy cost
£1,260
EPCs since 2021, at prices then
Built before 1930
27%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Malvern Hills average.

  • Band A, score 92 to 100: 2% of homes; Malvern Hills 3%.
  • Band B, score 81 to 91: 9% of homes; Malvern Hills 17%.
  • Band C, score 69 to 80: 22% of homes; Malvern Hills 25%.
  • Band D, score 55 to 68: 34% of homes; Malvern Hills 31%.
  • Band E, score 39 to 54: 21% of homes; Malvern Hills 17%.
  • Band F, score 21 to 38: 9% of homes; Malvern Hills 5%.
  • Band G, score 1 to 20: 3% of homes; Malvern Hills 2%.

Based on the latest energy performance certificate (EPC) for each of 2,445 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in WR15.

Main heating

Gas boiler53%
Oil boiler30%
Electric storage heaters10%
Other electric heating3%
Heat pump3%

Type of home

House73%
Bungalow18%
Flat8%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated23%
Cavity walls, not insulated11%
Cavity walls, insulated41%
Solid walls, insulated7%
Other walls (timber, system-built or modern)18%
Loft insulation under 100 mm (homes with a loft)16%
Double or triple glazing throughout80%
Solar panels3%

Upgrades recommended for homes in WR15

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Double glazing More common here

    On 16% of EPCs here (England and Wales: 9%). 20% of homes aren't fully double or triple glazed.

    Typical cost: £3,300–£6,500
  • Hot water cylinder insulation More common here

    On 13% of EPCs here (England and Wales: 8%).

    Typical cost: £15–£30
  • New condensing boiler More common here

    On 30% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Solar panels (PV)

    On 83% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 75% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 60% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000

With all its recommended upgrades, 86% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £190 a year, at the prices used when each EPC was issued.

Map of WR15 and nearby areas

How WR15 compares with the postcode districts around it.

DY7, Stourbridge: D 64DY10, Kidderminster: D 66WV16, Bridgnorth: D 62DY11, Kidderminster: D 65DY14, Kidderminster: D 55DY12, Bewdley: D 61DY13, Stourport-On-Severn: D 66SY7, Craven Arms: E 54SY8, Ludlow: D 61WR9, Droitwich: D 67HR6, Leominster: D 62WR2, Worcester: C 69WR6, Worcester: D 56HR7, Bromyard: D 62HR4, Hereford: D 65WR13, Malvern: D 62HR1, Hereford: D 66DY14DY12DY13SY8HR6WR6HR7WR15DY11DY14DY12DY13SY8HR6WR6HR7WR15
Colour shows each district's average rating. Tap a district to open it. WR15 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in WR15?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.