Skip to content
EPCMap

How energy efficient are homes in L11 (Liverpool)?

Summary

Average rating

C70

Liverpool average: D 68

Homes in L11 have an average EPC rating of C (70), a little above the Liverpool average of D (68).

Rated D or worse
34%
Liverpool: 43%
Typical yearly energy cost
£975
EPCs since 2021, at prices then
Built before 1930
9%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Liverpool average.

  • Band A, score 92 to 100: 1% of homes; Liverpool <1%.
  • Band B, score 81 to 91: 16% of homes; Liverpool 12%.
  • Band C, score 69 to 80: 48% of homes; Liverpool 45%.
  • Band D, score 55 to 68: 27% of homes; Liverpool 32%.
  • Band E, score 39 to 54: 5% of homes; Liverpool 9%.
  • Band F, score 21 to 38: 1% of homes; Liverpool 2%.
  • Band G, score 1 to 20: <1% of homes; Liverpool <1%.

Based on the latest energy performance certificate (EPC) for each of 9,414 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in L11.

Main heating

Gas boiler93%
Communal or district heating3%
Heat pump2%
Other electric heating1%

Type of home

House88%
Flat7%
Bungalow4%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated4%
Cavity walls, not insulated15%
Cavity walls, insulated53%
Solid walls, insulated1%
Other walls (timber, system-built or modern)26%
Loft insulation under 100 mm (homes with a loft)20%
Double or triple glazing throughout96%
Solar panels4%

Upgrades recommended for homes in L11

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 80% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 75% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 62% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Cavity wall insulation

    On 16% of EPCs here (England and Wales: 16%). 15% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Heating controls

    On 15% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450
  • New condensing boiler

    On 14% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 97% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £91 a year, at the prices used when each EPC was issued.

Map of L11 and nearby areas

How L11 compares with the postcode districts around it.

L32, Liverpool: C 71L23, Liverpool: D 65L70: not enough EPCs to showL31, Liverpool: D 67L30, Bootle: D 68L20, Bootle: D 67L33, Liverpool: C 72L10, Liverpool: D 66L21, Liverpool: D 67WA11, St. Helens: D 65L4, Liverpool: D 66L9, Liverpool: D 65L13, Liverpool: D 64L28, Liverpool: C 71L5, Liverpool: C 71L12, Liverpool: D 65L34, Prescot: C 71L6, Liverpool: D 68L3, Liverpool: C 75L14, Liverpool: C 69L7, Liverpool: C 69L36, Liverpool: C 69L35, Prescot: D 68L32L70L33L10L4L9L13L28L5L12L6L14L11L32L70L30L33L10L4L9L13L28L5L12L6L14L11
Colour shows each district's average rating. Tap a district to open it. L11 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in L11?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.