Skip to content
EPCMap

How energy efficient are homes in CT15 (Dover)?

Summary

Average rating

D63

Dover average: D 67

Homes in CT15 have an average EPC rating of D (63), a little below the Dover average of D (67).

Rated D or worse
62%
Dover: 50%
Typical yearly energy cost
£1,255
EPCs since 2021, at prices then
Built before 1930
20%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Dover average.

  • Band A, score 92 to 100: <1% of homes; Dover <1%.
  • Band B, score 81 to 91: 9% of homes; Dover 15%.
  • Band C, score 69 to 80: 29% of homes; Dover 34%.
  • Band D, score 55 to 68: 39% of homes; Dover 36%.
  • Band E, score 39 to 54: 16% of homes; Dover 11%.
  • Band F, score 21 to 38: 5% of homes; Dover 3%.
  • Band G, score 1 to 20: 2% of homes; Dover <1%.

Based on the latest energy performance certificate (EPC) for each of 4,200 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in CT15.

Main heating

Gas boiler73%
Oil boiler16%
Electric storage heaters4%
Heat pump4%
Other electric heating3%

Type of home

House68%
Bungalow26%
Flat6%

Walls, roof and windows

Solid walls, not insulated16%
Cavity walls, not insulated22%
Cavity walls, insulated42%
Solid walls, insulated2%
Other walls (timber, system-built or modern)17%
Loft insulation under 100 mm (homes with a loft)20%
Double or triple glazing throughout89%
Solar panels2%

Upgrades recommended for homes in CT15

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Cavity wall insulation More common here

    On 25% of EPCs here (England and Wales: 16%). 22% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Loft insulation top-up More common here

    On 18% of EPCs here (England and Wales: 12%). 20% of homes with a loft have less than 100 mm of insulation.

    Typical cost: £100–£350
  • Solar panels (PV)

    On 87% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 74% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 65% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 24% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 91% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £194 a year, at the prices used when each EPC was issued.

Map of CT15 and nearby areas

How CT15 compares with the postcode districts around it.

CT12, Ramsgate: C 70CT3, Canterbury: C 69ME13, Faversham: D 67CT11, Ramsgate: D 65CT7, Birchington: D 65CT13, Sandwich: D 66CT6, Herne Bay: D 67CT5, Whitstable: D 67CT4, Canterbury: D 61CT2, Canterbury: D 68CT1, Canterbury: C 70CT14, Deal: D 66TN25, Ashford: D 67CT16, Dover: C 69CT17, Dover: D 66CT19, Folkestone: D 66CT18, Folkestone: C 69CT20, Folkestone: D 68CT21, Hythe: D 66TN29, Romney Marsh: D 63CT3CT13CT4CT2CT1CT14TN25CT17CT19CT18CT21CT15CT3CT13CT4CT2CT1CT14TN25CT16CT17CT19CT18CT20CT21CT15
Colour shows each district's average rating. Tap a district to open it. CT15 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in CT15?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.