Skip to content
EPCMap

How energy efficient are homes in EN10 (Broxbourne)?

Summary

Average rating

D68

Broxbourne average: D 68

Homes in EN10 have an average EPC rating of D (68), about the same as the Broxbourne average of D (68).

Rated D or worse
42%
Broxbourne: 45%
Typical yearly energy cost
£867
EPCs since 2021, at prices then
Built before 1930
6%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Broxbourne average.

  • Band A, score 92 to 100: <1% of homes; Broxbourne <1%.
  • Band B, score 81 to 91: 12% of homes; Broxbourne 13%.
  • Band C, score 69 to 80: 46% of homes; Broxbourne 42%.
  • Band D, score 55 to 68: 30% of homes; Broxbourne 34%.
  • Band E, score 39 to 54: 10% of homes; Broxbourne 10%.
  • Band F, score 21 to 38: 2% of homes; Broxbourne 1%.
  • Band G, score 1 to 20: <1% of homes; Broxbourne <1%.

Based on the latest energy performance certificate (EPC) for each of 5,402 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in EN10.

Main heating

Gas boiler78%
Electric storage heaters10%
Other electric heating7%
Communal or district heating2%
Heat pump1%
Oil boiler1%
Other or unrecorded1%

Type of home

House58%
Flat36%
Bungalow4%
Maisonette3%

Walls, roof and windows

Solid walls, not insulated15%
Cavity walls, not insulated22%
Cavity walls, insulated45%
Other walls (timber, system-built or modern)17%
Loft insulation under 100 mm (homes with a loft)20%
Double or triple glazing throughout93%

Upgrades recommended for homes in EN10

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Modern storage heaters More common here

    On 11% of EPCs here (England and Wales: 6%). 16% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • Hot water cylinder insulation More common here

    On 15% of EPCs here (England and Wales: 8%).

    Typical cost: £15–£30
  • Solar panels (PV)

    On 60% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 48% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 42% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Cavity wall insulation

    On 23% of EPCs here (England and Wales: 16%). 22% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 95% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £105 a year, at the prices used when each EPC was issued.

Map of EN10 and nearby areas

How EN10 compares with the postcode districts around it.

AL7, Welwyn Garden City: C 71SG14, Hertford: D 68SG12, Ware: D 66CM20, Harlow: C 70EN11, Hoddesdon: D 67CM19, Harlow: D 67SG13, Hertford: D 68AL9, Hatfield: D 66EN7, Waltham Cross: C 69EN8, Waltham Cross: D 68EN6, Potters Bar: D 65EN9, Waltham Abbey: D 67CM16, Epping: D 66EN2, Enfield: D 65EN5, Barnet: D 66EN3, Enfield: D 67EN1, Enfield: D 65EN4, Barnet: D 67EN11CM19SG13EN7EN8EN9EN10EN11CM19SG13EN7EN8EN9EN10
Colour shows each district's average rating. Tap a district to open it. EN10 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in EN10?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.