Skip to content
EPCMap

How energy efficient are homes in RG24 (Basingstoke)?

Summary

Average rating

C74

Basingstoke and Deane average: C 70

Homes in RG24 have an average EPC rating of C (74), a little above the Basingstoke and Deane average of C (70).

Rated D or worse
24%
Basingstoke and Deane: 39%
Typical yearly energy cost
£856
EPCs since 2021, at prices then
Built before 1930
1%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Basingstoke and Deane average.

  • Band A, score 92 to 100: <1% of homes; Basingstoke and Deane <1%.
  • Band B, score 81 to 91: 30% of homes; Basingstoke and Deane 18%.
  • Band C, score 69 to 80: 46% of homes; Basingstoke and Deane 42%.
  • Band D, score 55 to 68: 21% of homes; Basingstoke and Deane 29%.
  • Band E, score 39 to 54: 3% of homes; Basingstoke and Deane 8%.
  • Band F, score 21 to 38: <1% of homes; Basingstoke and Deane 2%.
  • Band G, score 1 to 20: <1% of homes; Basingstoke and Deane <1%.

Based on the latest energy performance certificate (EPC) for each of 13,562 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in RG24.

Main heating

Gas boiler91%
Other electric heating4%
Electric storage heaters3%

Type of home

House70%
Flat23%
Bungalow5%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated1%
Cavity walls, not insulated9%
Cavity walls, insulated49%
Other walls (timber, system-built or modern)40%
Loft insulation under 100 mm (homes with a loft)11%
Double or triple glazing throughout97%

Upgrades recommended for homes in RG24

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 69% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 65% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 34% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 15% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Loft insulation top-up

    On 12% of EPCs here (England and Wales: 12%). 11% of homes with a loft have less than 100 mm of insulation.

    Typical cost: £100–£350
  • Cavity wall insulation

    On 10% of EPCs here (England and Wales: 16%). 9% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 97% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £81 a year, at the prices used when each EPC was issued.

Map of RG24 and nearby areas

How RG24 compares with the postcode districts around it.

RG40, Wokingham: C 72RG20, Newbury: D 59RG19, Thatcham: C 69RG7, Reading: D 67RG26, Tadley: D 67RG27, Hook: C 70RG21, Basingstoke: C 70RG22, Basingstoke: C 69RG23, Basingstoke: C 73RG29, Hook: D 68RG25, Basingstoke: D 64GU10, Farnham: D 66GU34, Alton: C 69SO21, Winchester: D 64RG26RG27RG21RG22RG23RG29RG25RG24RG26RG27RG21RG22RG23RG29RG25RG24
Colour shows each district's average rating. Tap a district to open it. RG24 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in RG24?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.