Skip to content
EPCMap

How energy efficient are homes in DE75 (Heanor, Amber Valley)?

Summary

Average rating

D65

Amber Valley average: D 66

Homes in DE75 have an average EPC rating of D (65), about the same as the Amber Valley average of D (66). 30% of homes here have solid walls with no insulation.

Rated D or worse
57%
Amber Valley: 54%
Typical yearly energy cost
£1,044
EPCs since 2021, at prices then
Built before 1930
28%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Amber Valley average.

  • Band A, score 92 to 100: <1% of homes; Amber Valley 2%.
  • Band B, score 81 to 91: 11% of homes; Amber Valley 14%.
  • Band C, score 69 to 80: 31% of homes; Amber Valley 30%.
  • Band D, score 55 to 68: 41% of homes; Amber Valley 38%.
  • Band E, score 39 to 54: 14% of homes; Amber Valley 13%.
  • Band F, score 21 to 38: 2% of homes; Amber Valley 3%.
  • Band G, score 1 to 20: <1% of homes; Amber Valley <1%.

Based on the latest energy performance certificate (EPC) for each of 6,175 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in DE75.

Main heating

Gas boiler91%
Electric storage heaters3%
Other electric heating2%
Heat pump1%
Oil boiler1%

Type of home

House78%
Bungalow12%
Flat8%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated30%
Cavity walls, not insulated9%
Cavity walls, insulated43%
Solid walls, insulated4%
Other walls (timber, system-built or modern)14%
Loft insulation under 100 mm (homes with a loft)19%
Double or triple glazing throughout95%
Solar panels1%

Upgrades recommended for homes in DE75

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 87% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 72% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 63% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 30% of EPCs here (England and Wales: 24%). 30% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 23% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 21% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 94% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £134 a year, at the prices used when each EPC was issued.

Map of DE75 and nearby areas

How DE75 compares with the postcode districts around it.

DE55, Alfreton: D 67DE4, Matlock: D 64NG15, Nottingham: C 69DE5, Ripley: D 66DE56, Belper: D 65NG16, Nottingham: D 66NG8, Nottingham: D 66DE7, Ilkeston: D 66DE21, Derby: D 65NG9, Nottingham: D 65DE5NG16DE7DE75DE5NG16DE7DE75
Colour shows each district's average rating. Tap a district to open it. DE75 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in DE75?

About 30% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.